D65 Manual
2020年12月4日 更新
开启更多功能,提升办公效能





List of Screws and Pads



Assembly process(Hot-swap Version)

Step 1:Gaskets

First use 16 gaskets to stick the protruding part of the plate along the edge, Make sure it’s neatly pasted. 1. The only thing to pay attention to is to use the shortest gaskets for the arrow keys area. Paste it on the right, otherwise it will affect the blocker.


gaskets installation position indication diagram




Note:Black and Green are of different widths




Step 2:Plate Screw

  • #1 M2-3---Plate
  • #5 M2-3(Standoff)



Step 3:Stabilizers

Take out the PCB and plug in the data cable, open the VIA to test (touch the hot-swappable solder joints on the back with tweezers), make sure the PCB is intact, and then assemble it, take out the satelliters and install them in the style shown below!


Step 4:PCB foam





Step 5:PCB screw

  • #2 M2-3 screw---PCB





Step 6:Switches

Press the switches you prepared to the fixed pcb in the correct direction make sure that the switches pins are not bent when pressing,  after allinstalled, open the VIA test one more time.





Step 7:Top case

Place the assembled PCB on the upper piece in the direction shown  in the figure below, paying attention to the USB interface.Don't pretend to be crooked. And add the another foam at the same time!








Step 8:Bottom Case foam







Step 9:Bottom case



Step 10:All screws

  • #3 M2-8 ---Case
  • #4 M2-4 ---Brass weight

After installing the bottom case, screw the #3 M2-8 cup head 6-bobes recess screws to the bottom case, and the brass weight screw is #4 M2-4 cup head 6-bobes recess, and finally stick the black round foot pad on.




Step 11:Keycaps



Assembly complete

Via Tools tutorial video

Screen_Recording_2020-09-29_at_1.03.33_PM.mov46.4MB

Tools Download:https://github.com/the-via/releases/releases/tag/v1.3.1






-----------分割线------------

D65 组装流程中文版


螺丝及脚垫清单


D65 热插拔版本组装流程

第一步:安装垫片

先用 16 根静音棉条将定位板凸出部分沿边贴好,要贴得整齐。唯一要注意的是方向键那边的静音棉条要用最短的,靠右边贴,不然会挡住门牙!

垫片安装位置示意图(黑色和绿色的宽度不一样)





第二步:安装定位板螺丝

  • #1 M2-3---安装定位板
  • #5 M2-3(螺丝柱)

取出我们的螺丝袋,找出#1 M2-3 沉头螺丝和#5 螺丝柱,将铜柱在定位板背后用手扶住对准螺丝孔位,正面用螺丝将铜柱固定,以此类推,全部拧好。




第三步:安装卫星轴

第四步:安装 PCB 静音棉


第五步:安装 PCB 螺丝

  • #2 M2-3 screw---安装 PCB



第六步:安装轴体

将你准备好的轴体按照正确的方向依次按到我们固定好的 pcb 上,按轴时注意轴脚是否弯曲,弯曲了扳直再按,不然有可能将 PCB 热插拔顶脱落,全部装好后,再打开 VIA 测试一遍,全部触发再进行下一步.



第七步:安装上壳

第八步:安装底部静音棉

第九步:安装底部外壳


第十步:安装外壳及铜配重螺丝

  • #3 M2-8 ---安装外壳
  • #4 M2-4 ---安装铜配重



第十步:安装键帽



第十一步:完成组装


VIA 使用视频教程


Screen_Recording_2020-09-29_at_1.03.33_PM.mov46.4MB

VIA工具最新版 下载地址

https://github.com/the-via/releases/releases/tag/v1.3.1